Warranty: | 2 Years Warrantee |
---|---|
Type: | Extrusion Blow Molding Machine |
Raw Material: | HDPE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | GS-3L-II | |
Material | PE,PP… | |
Max.container capacity | L | 3 |
Number of die | set | 1, 2, 3, 4,5,6 |
Machine Dimension | m | 3.74×2.8×2.3 |
Total weight | ton | 8 |
Accumulator head | GS-3L-II | |
Number of die heating | zone | 4-19 |
Power of die heating | KW | 4.5-16.5 |
Max die-pin diameter | mm | 80 |
Center distance of twin-die | mm | 240 |
Center distance of tri-die | mm | 160 |
Center distance of four-die | mm | 110 |
Center distance of six-die | mm | 75 |
Clamping Unit | GS-3L-II | |
Clamping force | KN | 75 |
platen opening stroke | mm | 170-350 |
platen size | mm | 440×250 |
Max mould size | mm | 550×280 |
Mould thickness | mm | 170-220 |
Extruder Unit | GS-3L-II | |
Screw diameter | mm | 70 |
Screw L/D ratio | L/D | 25\1 |
Extruding Volume | Kg/hr | 100-120 |
Number of heating zone | zone | 4 |
Extruder heating power | KW | 12 |
Extruder driving power | KW | 30 |
Power | GS-3L-II | |
Oil pump drive power | KW | 15 |
Fan power for screw | KW | 0.5 |
Total power | KW | 58-70 |
Air pressure | Mpa | 0.6 |
Air consumption | m³/min | 1.5-2.0 |
Average energy consumption | KW | 38 |
Cooling water consumption | m³/h | 1.5-2.5 |
-Extrusion blow molding machine is for 50ml-200L PE/PP bottles, jerrycans, and drums.
-Engineer is available to overseas for installation, commissioning, and short-term training.
-All easy-wearing parts or components are available in our own warehouse.
-We guarantee the quality, and provide good service to customers.
1. Toggle-balanced clamping frame, with well-known liner guide rail from Taiwan; great clamping force and explosion-proof;
2. Can be achieved 16 blow pins at the same time perpendicular to the mold pin blow hole; patented die head, easy for changing color.
3. Computer intelligent control system, operation, set and modify the production process conveniently
4. Deep mirror treatment is used inside the die head, curve flow channels are smooth, no dead ends, no carbon left;
5. Strengthened and hardened cold treated screws, screw and barrel are with wear resistance; parts of tube wall thickness are very uniform
6. Various components are produced with Japan's CNC machine tools, use Mazak to process six-sided installation surfaces at the same time. Imported well-known brands Hydraulic, pneumatic and electrical parts are equipped to ensure that the rigorous process, stable and reliable quality.
-Installation & testing
A technician shall be sent to test the machine till it can work normally upon buyer's notification when everything is ready for installation and testing. The buyer shall bear all the charges involved since the technician leave off seller's company till he gets back, charges including transportation expenses, visa fee, accommodation, and insurance, etc. If the technician is required to go abroad, USD 120/day shall be charged as the service fee within the same time period stated above.
-Warranty & Guarantee
We provide 2 years guarantee since machine is running normally at buyer's factory.
The seller shall deal with all the problems due to the quality of the machine within the guarantee
period, with the damaged parts (unit price > USD 50) sent back for new ones.
Our company act strictly according to the requirement of ISO 9001 quality system with every spare part registered before shipment so as to assure prompt service.
24hours online for technical support